Construction runs on documents that arrive faster than anyone can read them: tender packages, bills of quantities, subcontractor invoices, change orders and daily site reports. Most of that work still happens in spreadsheets and email. Custom software and AI tools can capture site reality, structure the paperwork and give project managers numbers they can trust.
≈ €70,000 / yrsaved per year on overruns and admin
4–6 mo.usual payback for this kind of build
The challenges
What slows this industry down
01/02
01
Tender documents nobody has time to read
A single public tender can run to hundreds of pages of technical specifications, annexes and BOQ tables. Estimators skim under deadline pressure, miss a clause or a quantity, and the error only surfaces once the contract is signed.
02
Site reports that never reach the office
Foremen record progress, weather, deliveries and headcount on paper or in a chat group. By the time anything is retyped into the project system, it's days old and too fragmented to support a claim or a variation.
03
Subcontractor data in fifteen formats
Every subcontractor sends progress claims, timesheets and invoices in their own layout. Reconciling them against the contract, the BOQ and actual work in place is manual, slow and a recurring source of payment disputes.
04
Safety and compliance paperwork
Certificates, training records, toolbox talks, equipment inspections and risk assessments expire on different dates across dozens of people and machines. Finding the current version during an inspection often means searching shared drives and email.
What can be built
What software and AI can take over here
02/02
01
Tender and BOQ document analysis
AI-assisted extraction that pulls line items, quantities, units and technical requirements out of tender PDFs and spreadsheets, then flags unusual clauses so estimators review exceptions instead of reading everything.
60–80 hhours saved / month, typically
02
Mobile site reporting
An offline-capable app for daily logs, photos, deliveries and headcount, with structured fields that feed straight into project tracking. Signal is unreliable on site, so data syncs when the device reconnects.
50–60 hhours saved / month, typically
03
Subcontractor and progress claim portal
A single place where subcontractors submit claims, timesheets and documents against the correct contract lines. Automated checks compare submitted quantities with approved work before anything reaches accounting.
30–40 hhours saved / month, typically
04
Project cost and schedule dashboards
Consolidated views of budget, committed cost, actual spend and progress across projects, pulling from your ERP, accounting system and site data rather than from a spreadsheet somebody maintains by hand.
20–40 hhours saved / month, typically
05
Safety documentation register
A central register of certificates, inspections and training with expiry tracking, automatic reminders and instant retrieval of the valid document for a given person, machine or site during an audit.
10–30 hhours saved / month, typically
Savings potential
What it saves, in numbers
Reviewing tender documents and the bill of quantities
Manual today12 h
With the solution3 h
75%faster
Daily site diary and progress report
Manual today40 min
With the solution8 min
80%faster
Approving a subcontractor progress claim
Manual today60 min
With the solution12 min
80%faster
These are model estimates of what this kind of automation can do — not measured results from our own projects. We recalculate them on your real volumes and systems before anyone commits to anything.
Contact
Tell us what's slowing you down.
Tell us about your project, the bottleneck in your processes, or the legacy system you've outgrown. We're available 24/7 and we reply to messages promptly — with concrete next steps, no obligation and no sales theater.